Below, you will find examples of our top-performing team, in pictures as well as in figures. Nevertheless: There are (too) many excellent examples, the listed references only represent a small choice. For a quicker orientation, they are divided into categories. For questions on dedicated projects, please feel free to contact us!

Industrial and Office Buildings

  • BIKINI BERLIN OFFICE BUILDING BTC

    High-end office finishings, sales outlets,
    HLS, ELT, FMT, GLT

    Total Construction Costs:8.500.000

    BIKINI BERLIN OFFICE BUILDING BTC

    BIKINI BERLIN OFFICE BUILDING BTC

    Special Offer:

    $
    Purchase Now
  • ELWA MANUFACTURING PLANT

    Change in use of the store-rooms
    New construction of production rooms incl. canteen

    Total Construction Costs:4.800.000

    ELWA MANUFACTURING PLANT

    Change in use of the store-rooms
    New construction of production rooms incl. canteen

    Special Offer:

    $
    Purchase Now
  • HIH TIRE STORAGE FACILITIES

    LP 1-7, Partial restoration Sprinkler system of tire storage facilities
    (80.000 tires), Extinguishing system according to VDS (water tank: 2,500 m³ incl. 5 diesel pumps)

    Total Construction Costs:1.500.000

    HIH TIRE STORAGE FACILITIES

    LP 1-7, Partial restoration Sprinkler system of tire storage facilities
    (80.000 tires), Extinguishing system according to VDS (water tank: 2,500 m³ incl. 5 diesel pumps)

    Special Offer:

    $
    Purchase Now
  • FRANKONIA CHOCOLATE MANUFACTURING

    Exchange of 5 ventilation devices, construction
    of a centralized cooling station incl. 2 cooling units

     

    Total Construction Costs:1.600.000

    FRANKONIA CHOCOLATE MANUFACTURING

    Exchange of 5 ventilation devices, construction
    of a centralized cooling station incl. 2 cooling units  

    Special Offer:

    $
    Purchase Now
  • STAATLICHES HOFBRAEUHAUS MUNICH

    Exchange of steam generators Installation of heat recovery system for waste-heat using of NH 3 construction refrigeration engineering

    Total Construction Costs:450.000

    STAATLICHES HOFBRAEUHAUS MUNICH

    Exchange of steam generators Installation of heat recovery system for waste-heat using of NH 3 construction refrigeration engineering

    Special Offer:

    $
    Purchase Now
  • PUBLIC SERVICES MUNICH, UNDERGROUND RAILWAY

    Restoration and expansion of the control rooms in Underground stations, refrigeration engineering

    Total Construction Costs:250.000

    PUBLIC SERVICES MUNICH, UNDERGROUND RAILWAY

    Restoration and expansion of the control rooms in Underground stations, refrigeration engineering

    Special Offer:

    $
    Purchase Now
  • GASTEIG MUNICH

    New construction of glass roof, reconstruction Fire water supply, HLS

    Total Construction Costs:750.000

    GASTEIG MUNICH

    New construction of glass roof, reconstruction Fire water supply, HLS

    Special Offer:

    $
    Purchase Now
  • EERGO TOWER BUILDING, NUREMBERG

    Reorganization of Fire Protection, Fire Water Supply

    Total Construction Costs:2.500.000

    EERGO TOWER BUILDING, NUREMBERG

    Reorganization of Fire Protection, Fire Water Supply

    Special Offer:

    $
    Purchase Now
  • NEW CONSTRUCTION OF FUNKE MEDIA OFFICE, ESSEN

    Drainage (building and open areas) of 3 parts of the building, connection to public sewer system, several pumping installations

    Total Construction Costs:35.000.000

    NEW CONSTRUCTION OF FUNKE MEDIA OFFICE, ESSEN

    Drainage (building and open areas) of 3 parts of the building, connection to public sewer system, several pumping installations

    Special Offer:

    $
    Purchase Now
  • CHAIRGO GMBH, HERSBRUCK

    New construction of a sales outlet including administration and storage area

    Total Construction Costs:1.200.000

    CHAIRGO GMBH, HERSBRUCK

    New construction of a sales outlet including administration and storage area

    Special Offer:

    $
    Purchase Now
  • APG TRANSFORMER STATION

    Operational office, building services (TGA) Planning, N2 Extinguishing system, fire alarm system (BMA), Air conditioning

    Total Construction Costs:1.500.000

    APG TRANSFORMER STATION

    Operational office, building services (TGA) Planning, N2 Extinguishing system, fire alarm system (BMA), Air conditioning

    Special Offer:

    $
    Purchase Now
  • TRANSTHERMOS, MARKGRUEN

    Cold store, refrigeration engineering -38°C Two-stage refrigeration plant Federal Emission Control Act (BlmSchG) LP 1-3

    Total Construction Costs:6.500.000

    TRANSTHERMOS, MARKGRUEN

    Cold store, refrigeration engineering -38°C Two-stage refrigeration plant Federal Emission Control Act (BlmSchG) LP 1-3

    Special Offer:

    $
    Purchase Now
  • TCW WUSTERMARK

    Cold store, refrigeration engineering – 38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Total Construction Costs:7.500.000

    TCW WUSTERMARK

    Cold store, refrigeration engineering – 38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Special Offer:

    $
    Purchase Now
  • TCW GLESIEN

    Cold store, refrigeration engineering -38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Total Construction Costs:11.500.000

    TCW GLESIEN

    Cold store, refrigeration engineering -38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Special Offer:

    $
    Purchase Now
  • MUK GARCHING

    Extension to the cold store Refrigeration engineering – 38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Total Construction Costs:7.500.000

    MUK GARCHING

    Extension to the cold store Refrigeration engineering – 38°C Two-stage refrigeration plant NH3 according to Federal Emission Control Act (BlmSchG) LP 1-3

    Special Offer:

    $
    Purchase Now
  • SPECIAL AIRPORT OBERPFAFFENHOFEN

    New power station,Infrastructure LP 1-5

    Total Construction Costs:1.900.000

    SPECIAL AIRPORT OBERPFAFFENHOFEN

    New power station,Infrastructure LP 1-5

    Special Offer:

    $
    Purchase Now
  • VIZENZ MURR MANUFACTURING MUNICH

    Restoration and preparation of building application, new construction and reconstruction, sanitary facilities

    Total Construction Costs:450.000

    VIZENZ MURR MANUFACTURING MUNICH

    Restoration and preparation of building application, new construction and reconstruction, sanitary facilities

    Special Offer:

    $
    Purchase Now

Laboratories, Clean Rooms and Medical Facilities

  • Ludwig-Maximilians-Universität München

    Extension and new construction of the building, Full AC-System of 8 surgery rooms, Medical gas supply in 2 construction phases

    Total Construction Costs:2.900.000

    Ludwig-Maximilians-Universität München

    Extension and new construction of the building, Full AC-System of 8 surgery rooms, Medical gas supply in 2 construction phases

    Special Offer:

    $
    Purchase Now
  • EADS DORNIER, INNENSTADT

    Clean Room Space Transportation / 3D measuring laboratory, Restoration

    Total Construction Costs:550.000

    EADS DORNIER, INNENSTADT

    Clean Room Space Transportation / 3D measuring laboratory, Restoration

    Special Offer:

    $
    Purchase Now
  • LUDWIG –MAXIMILIANS-UNIVERSITY MUNICH

    Reconstruction of the rabbit hutches including air conditioning

    Total Construction Costs:200.000

    LUDWIG –MAXIMILIANS-UNIVERSITY MUNICH

    Reconstruction of the rabbit hutches including air conditioning

    Special Offer:

    $
    Purchase Now
  • KING MEDICAL CITY, RIYADH, SAUDI ARABIA

    BrainLAB, Detailled planning of the installation of a magnetic resonance scanner

    Total Construction Costs:2.500.000

    KING MEDICAL CITY, RIYADH, SAUDI ARABIA

    BrainLAB, Detailled planning of the installation of a magnetic resonance scanner

    Special Offer:

    $
    Purchase Now
  • LUDWIG-MAXIMILIANS-UNIVERSITY MUNICH

    Change in use of the animal stalls (for horse keeping)

    Total Construction Costs:885.000

    LUDWIG-MAXIMILIANS-UNIVERSITY MUNICH

    Change in use of the animal stalls (for horse keeping)

    Special Offer:

    $
    Purchase Now

Schools and Educational Facilities

  • BUERGERHAUS GARCHING

    Reconstruction of civic hall for up to 900 persons, full climate control, extension of heating, AC and ventilation system

    Total Construction Costs:8.500.000

    BUERGERHAUS GARCHING

    Reconstruction of civic hall for up to 900 persons, full climate control, extension of heating, AC and ventilation system

    Special Offer:

    $
    Purchase Now
  • Schulzentrum Grieskirchen

    Low-energy standard, Heating/ventilation/sanitary system, cooling; Measurement, control and regulation technology

    Total Construction Costs:40.000.000

    Schulzentrum Grieskirchen

    Schulzentrum Grieskirchen

    Special Offer:

    $
    Purchase Now
  • YOUTH CENTER PUCHHEIM

    Reconstruction and Extension of the event centers, mechanical, electrical, plumbing (MEP)

    Total Construction Costs:2.300.000

    YOUTH CENTER PUCHHEIM

    Reconstruction and Extension of the event centers, mechanical, electrical, plumbing (MEP)

    Special Offer:

    $
    Purchase Now
  • AFTER-SCHOOL CARE CLUB FACILITIES MUNICIPAL AUTHORITIES LINZ

    New construction heating system incl. heat pump ventilation facilities incl. heat recovery

    Total Construction Costs:2.500.000

    AFTER-SCHOOL CARE CLUB FACILITIES MUNICIPAL AUTHORITIES LINZ

    New construction heating system incl. heat pump ventilation facilities incl. heat recovery

    Special Offer:

    $
    Purchase Now
  • LUDWIGS-MAXIMILIANS-UNIVERSITY, MUNICH

    Reorganization of Fire protection, adjustments in utilization mechanical, electrical, plumbing (MEP)

    Total Construction Costs:2.500.000

    LUDWIGS-MAXIMILIANS-UNIVERSITY, MUNICH

    Reorganization of Fire protection, adjustments in utilization mechanical, electrical, plumbing (MEP)

    Special Offer:

    $
    Purchase Now
  • Ludwig-Maximilians-Universität München

    Austausch Groß-Autoklav S2-Laborbereich im laufenden Betrieb

    SAN, HZG, RLT, NSA, GLT

    Total Construction Costs:350.000,--

    Ludwig-Maximilians-Universität München

    Austausch Groß-Autoklav S2-Laborbereich im laufenden Betrieb SAN, HZG, RLT, NSA, GLT

    Special Offer:

    $
    Purchase Now
  • NURSERY SCHOOL

    Rudolf-Steiner-Verein, Energy optimization Reconstruction, mechanical, electrical, plumbing (MEP)

    Total Construction Costs:1.200.000

    NURSERY SCHOOL

    Rudolf-Steiner-Verein, Energy optimization Reconstruction, mechanical, electrical, plumbing (MEP)

    Special Offer:

    $
    Purchase Now

Residential Buildings

  • NABAU “HAUS DER ZUKUNFT” REGENSBURG

    New construction of 34 housing units incl. basement garage, German Energy Agency (DENA) model project

    Total Construction Costs:7.500.000

    NABAU “HAUS DER ZUKUNFT” REGENSBURG

    New construction of 34 housing units incl. basement garage, German Energy Agency (DENA) model project

    Special Offer:

    $
    Purchase Now
  • WOHNBAU KECKEISEN, MEMMINGEN

    New construction of a residential building, sanitary, heating and ventilation system, building control system

    Total Construction Costs:250.000

    WOHNBAU KECKEISEN, MEMMINGEN

    New construction of a residential building, sanitary, heating and ventilation system, building control system

    Special Offer:

    $
    Purchase Now
  • HOUSING COMPLEX ISIDOR I. CONSTRUCTION UNIT, LINZ

    New construction of 74 housing units

    Total Construction Costs:11.500.000

    HOUSING COMPLEX ISIDOR I. CONSTRUCTION UNIT, LINZ

    New construction of 74 housing units

    Special Offer:

    $
    Purchase Now
  • PRINZ-LUDWIG-STR., MUNICH

    Reconstruction and Restoration of a listed building
    luxury standard

    Total Construction Costs:3.800.000

    PRINZ-LUDWIG-STR., MUNICH

    Reconstruction and Restoration of a listed building
    luxury standard

    Special Offer:

    $
    Purchase Now
  • Wohnanlage Grundbachstr., Linz

    Neubau von 46 Wohneinheiten

    Total Construction Costs:9.000.000

    Wohnanlage Grundbachstr., Linz

    Neubau von 46 Wohneinheiten

    Special Offer:

    $
    Purchase Now
  • EFERDING – I. CONSTRUCTION SECTION

    Brandstätterstraße 18 Age-appropriate living, rent, 1 house, 28 housing units

    Total Construction Costs:

    EFERDING – I. CONSTRUCTION SECTION

    Brandstätterstraße 18 Age-appropriate living, rent, 1 house, 28 housing units

    Special Offer:

    $
    Purchase Now
  • EFERDING – II. CONSTRUCTION SECTION

    Brandstätterstraße 20, 22, Age-appropriate living, rent, 2 houses, 19 housing units

    Total Construction Costs:

    EFERDING – II. CONSTRUCTION SECTION

    Brandstätterstraße 20, 22, Age-appropriate living, rent, 2 houses, 19 housing units

    Special Offer:

    $
    Purchase Now
  • LANGENSTEIN- I. CONSTRUCTION SECTION

    Hauptstraße 75, rent, 1 House, 14 housing units

    Total Construction Costs:

    LANGENSTEIN- I. CONSTRUCTION SECTION

    Hauptstraße 75, rent, 1 House, 14 housing units

    Special Offer:

    $
    Purchase Now
  • LANGENSTEIN- II. CONSTRUCTION SECTION

    Hauptstraße 77, rent, 1 House, apartments

    Total Construction Costs:

    LANGENSTEIN- II. CONSTRUCTION SECTION

    Hauptstraße 77, rent, 1 House, apartments

    Special Offer:

    $
    Purchase Now
  • LEONDING CENTER, OWNER-OCCUPIED FLATS

    Anna-Mitgutsch-Straße 1 und 3, 22 housing units

    Total Construction Costs:

    LEONDING CENTER, OWNER-OCCUPIED FLATS

    Anna-Mitgutsch-Straße 1 und 3, 22 housing units

    Special Offer:

    $
    Purchase Now
  • LEONDING CENTER, KUERNBERGBLICK

    Postal address: Ruflingerstr. 12 c, age-appropriate living, 1 house, 27 housing units

    Total Construction Costs:

    LEONDING CENTER, KUERNBERGBLICK

    Postal address: Ruflingerstr. 12 c, age-appropriate living, 1 house, 27 housing units

    Special Offer:

    $
    Purchase Now
  • EFERDING – III. CONSTRUCTION SECTION

    Brandstätterstraße 12, Rent, 1 house, 20 housing units

    Total Construction Costs:

    EFERDING – III. CONSTRUCTION SECTION

    Brandstätterstraße 12, Rent, 1 house, 20 housing units

    Special Offer:

    $
    Purchase Now
  • EFERDING – IV. CONSTRUCTION SECTION

    Brandstätterstraße 10, 14, 16, Rent, 3 houses 60 housing units

    Total Construction Costs:

    EFERDING – IV. CONSTRUCTION SECTION

    Brandstätterstraße 10, 14, 16, Rent, 3 houses 60 housing units

    Special Offer:

    $
    Purchase Now
  • LEONDING, BERGHAM

    6 semi-detached houses, 1 single house (13 serial houses), Ownership

    Total Construction Costs:

    LEONDING, BERGHAM

    6 semi-detached houses, 1 single house (13 serial houses), Ownership

    Special Offer:

    $
    Purchase Now
  • LEONDING, LIMESSTR

    509 m³ business area, 20 Flats, rent

    Total Construction Costs:

    LEONDING, LIMESSTR

    509 m³ business area, 20 Flats, rent

    Special Offer:

    $
    Purchase Now
  • GIWOG ISIDOR I

    Age-appropriate living, 40 housing units

    Total Construction Costs:

    GIWOG ISIDOR I

    Age-appropriate living, 40 housing units

    Special Offer:

    $
    Purchase Now
  • GIWOG ISIDOR I

    34 rented flats

    Total Construction Costs:

    GIWOG ISIDOR I

    34 rented flats

    Special Offer:

    $
    Purchase Now
  • GIWOG ISIDOR II

    54 rented flats

    Total Construction Costs:

    GIWOG ISIDOR II

    54 rented flats

    Special Offer:

    $
    Purchase Now
  • GIWOG HOUSING COMPLEX GRUNDBACHSTR., LINZ

    New construction of 46 housing units

    Total Construction Costs:

    GIWOG HOUSING COMPLEX GRUNDBACHSTR., LINZ

    New construction of 46 housing units

    Special Offer:

    $
    Purchase Now
  • Giwog Grundundbachstr. 2.BA

    12 Mietwohnungen

    Total Construction Costs:

    Giwog Grundundbachstr. 2.BA

    12 Mietwohnungen

    Special Offer:

    $
    Purchase Now

Energy Optimization

  • EADS Ottobrunn, München

    Cooling center 9,2 megawatt Free cooling


    Yearly saving:567.000
    Years of amortization: < 3,2

    EADS Ottobrunn, München

    Cooling center 9,2 megawatt Free cooling

    Special Offer:

    $
    Purchase Now
  • AIRPORT PFAFFENHOFEN

    Heat generation 8.5 MW cogeneration unit


    Yearly saving:345.000
    Years of amortization: < 5,5

    AIRPORT PFAFFENHOFEN

    Heat generation 8.5 MW cogeneration unit

    Special Offer:

    $
    Purchase Now
  • FRANKONIA SCHOKOLADENWERKE GMBH

    Refrigeration technology, compressed air, air-conditioning, heating


    Yearly saving:151.500
    Years of amortization: < 6,5

    FRANKONIA SCHOKOLADENWERKE GMBH

    Refrigeration technology, compressed air, air-conditioning, heating

    Special Offer:

    $
    Purchase Now
  • STAATLICHES HOFBRAEUHAUS MUNICH

    Low pressure steam, refrigeration, compressed-air, hot water


    Yearly saving:85.000
    Years of amortization: < 4,4

    STAATLICHES HOFBRAEUHAUS MUNICH

    Low pressure steam, refrigeration, compressed-air, hot water

    Special Offer:

    $
    Purchase Now
  • PORSCHE CENTER MUNICH

    Holistic energy optimization of the building services, Concept for tire storage


    Yearly saving:35.000
    Years of amortization: < 2,7

    PORSCHE CENTER MUNICH

    Holistic energy optimization of the building services, Concept for tire storage

    Special Offer:

    $
    Purchase Now
  • Universität Darmstadt

    Student services, Canteen 1 & 2:

    Energy optimization of the technical building installations


    Yearly saving:125.000
    Years of amortization: < 1,8

    Universität Darmstadt

    Student services, Canteen 1 & 2: Energy optimization of the technical building installations

    Special Offer:

    $
    Purchase Now
  • Algenzucht-Glashaus

    Feasibility study: Algae farming glasshouse for fuel production

    TEC Generation, EADS


    Yearly saving:
    Years of amortization: <

    Algenzucht-Glashaus

    Feasibility study: Algae farming glasshouse for fuel production TEC Generation, EADS

    Special Offer:

    $
    Purchase Now
  • Mozarteum Salzburg

    Energy and system optimization


    Yearly saving:45.500
    Years of amortization: < 5,8

    Mozarteum Salzburg

    Energy and system optimization

    Special Offer:

    $
    Purchase Now
  • Volks- und Hauptschule Unterhaching

    Energy optimization of the technical building installations, restructuring, Fire-safety improvements


    Yearly saving:27.500
    Years of amortization: < 3,8

    Volks- und Hauptschule Unterhaching

    Energy optimization of the technical building installations, restructuring, Fire-safety improvements

    Special Offer:

    $
    Purchase Now
  • MUENCHENSTIFT GMBH MUNICH

    Holistic energy optimization steam network, ventilation systems, consulting with regard to optimization of building services


    Yearly saving:73.500
    Years of amortization: < 5,7

    MUENCHENSTIFT GMBH MUNICH

    Holistic energy optimization steam network, ventilation systems, consulting with regard to optimization of building services

    Special Offer:

    $
    Purchase Now
  • TRANE KÄLTETECHNISCHE BÜRO KRAILLING

    Optimization of building services, heat pump technology restructuring plan


    Yearly saving:25.700
    Years of amortization: < 3,45

    TRANE KÄLTETECHNISCHE BÜRO KRAILLING

    Optimization of building services, heat pump technology restructuring plan

    Special Offer:

    $
    Purchase Now
  • GLEKO ENERGY EFFICIENCY CONSULTING

    The Reconstruction Loan Corporation (Kreditanstalt für Wiederaufbau, KfW) optimization of the building services, restructuring plan


    Yearly saving:17.350
    Years of amortization: < 3,8

    GLEKO ENERGY EFFICIENCY CONSULTING

    The Reconstruction Loan Corporation (Kreditanstalt für Wiederaufbau, KfW) optimization of the building services, restructuring plan

    Special Offer:

    $
    Purchase Now
  • VILLA OF FAMILY SCHROBENHAUSER UNTERHACHING

    Holistic energy optimization building services, restructuring plan


    Yearly saving:16.500
    Years of amortization: < 4,5

    VILLA OF FAMILY SCHROBENHAUSER UNTERHACHING

    Holistic energy optimization building services, restructuring plan

    Special Offer:

    $
    Purchase Now

And when can we get your project here?